Figure 3. This sedimentation basin was converted to a bioretention cell at the end of construction. The concrete outlet was later utilized as the high-flow bypass. The slow drawdown skimmer was attached to the concrete structure in the same location as the bioretention cell’s underdrains.
Sedimentation basin transformed into a bioretention cell