Figure 3. Methods used to survey undercut banks, including placing the prism against the streambank with 0 feet for rod height (left) and horizontal offset measurement where the bottom of the survey rod is lowered to the point of inflection and a ruler is used to measure the distance to the bank at 90° (right).