Figure 4. Collection container layout for calibration of a stationary sprinkler system with one lateral operated at a time. For the setup shown, the procedure must be performed twice, once for lateral A, once for lateral B.
A second alternative is to perform the procedure twice, once on each side of the lateral using 16 containers at a time