Figure 5. A sluice gate lowered at the end of a rectangular channel in a closed position (left, at high tide) and raised in an open position (right, at low tide, discharging stormwater runoff).
Schematics: (l) Rectangular channel with closed sluice gate holding back water outside channel. (r) Same channel with sluice gate raised and discharging water to water body below.